Our houses

22 care homes in Brussels, Flanders and Wallonia. 20 entries for 22 houses: Orfea and Artemia, and the two CREB Woluwe houses, are presented together.

  • 690 places
  • 244 open places
  • 446 places to come
  • Open house

    Les Bolets

    Watermael-Boitsfort, 10 places

    Our very first centre. It has ten places in Watermael-Boitsfort and opened in 2008, following two years of fundraising.

  • Open house

    Orfea and Artemia

    Etterbeek, 40 places

    Two buildings in Etterbeek, with a total of forty spots. A day center opened in late 2012, and a community center opened in March 2013.

  • Open house

    La Villa Pilifs

    Neder-over-Heembeek, 30 places

    Twenty residential spaces and ten day-activity spaces in Neder-over-Heembeek, which opened in March 2015.

  • Open house

    FARRA Strategy

    Auderghem, 32 places

    A day center for thirty-two adults, which opened in October 2016 in Auderghem.

  • Open house

    ARTOS

    Woluwe-Saint-Pierre, 25 places

    A day center and a bakery workshop for twenty-five adults, which opened in September 2018 in Woluwe-Saint-Pierre.

  • Open house

    CREB Anderlecht

    Anderlecht, 30 places

    Thirty spots for children with multiple disabilities, opening on September 1, 2021. Seven years of work.

  • Open house

    Les Piloux, Our Inclusive Daycare Center

    Neder-over-Heembeek, 20 places

    About 20 spots, nearly half of which are reserved for children with intellectual disabilities. Opened on December 15, 2021.

  • Open house

    La Toûne

    Haut-Ittre, 16 places

    Ten beds for people with dual diagnosis in Haut-Ittre. It opened in January 2023, following a construction project that nearly never came to fruition.

  • Open house

    Les Anémones

    Grez-Doiceau, 41 places

    A new facility for ten children with autism and a dual diagnosis, and a renovated center for adults with eleven additional beds. The project was completed in September…

  • House approved or under construction

    La Forestière

    Ixelles, 64 places

    Sixty-four people are housed there every day in buildings that were never designed for them. A 5,210,000-euro construction project is underway to address this issue.

  • House approved or under construction

    CREB Woluwe

    Woluwe-Saint-Lambert, 82 places

    The most ambitious project ever undertaken by Constellations. Fifty-five spots in a day center and twenty-seven in residential care for children with severe intellectual disabilities.

  • House approved or under construction

    ATIPI

    Watermael-Boitsfort, 20 places

    A deconsecrated chapel in Watermael-Boitsfort has been converted into a day center for twenty young adults with intellectual disabilities. A project designed in collaboration with the neighborhood, not…

  • House approved or under construction

    FARILU

    Watermael-Boitsfort, 25 places

    A day center that is in danger of closing due to a lack of space will expand from 15 to 25 spots in a new building.

  • House approved or under construction

    Les Aubépines

    Incourt, 24 places

    Twenty-four older adults with autism living in a building in a state of advanced disrepair. Its complete reconstruction is one of our top priorities.

  • House approved or under construction

    Le Bois Marcelle

    Marcinelle, 33 places

    Twenty-eight children with autism, ages three to eight, most of whom do not speak, are housed in buildings that no longer meet standards. Total cost of reconstruction: 2,711,184…

  • House approved or under construction

    Les Foyers de Bothey

    Gembloux, 45 places

    Sixty adults are housed near Gembloux, including forty-one in a building that is no longer suitable. Reconstruction into four living units: 6,000,000 euros.

  • Planned house

    Le Renivaux

    Ottignies-Louvain-la-Neuve, 30 places

    Twenty-five residents with multiple disabilities or dual diagnoses in Ottignies-Louvain-la-Neuve, in a building that has become too small and dilapidated. A three-phase project to build, renovate, and create…

  • Planned house

    Centre Tisser

    Anderlecht, 25 places

    The TISSER project calls for the creation of 25 new places for day care for adults with multiple disabilities and high levels of dependency, 10 of which will…

  • Planned house

    Nido

    Haren, 30 places

    Thirty people with intellectual disabilities, autism spectrum disorder (ASD), or dual diagnoses will be housed in Haren (Brussels City), thanks to the construction of a new building and…

Act with us

Every gesture can open a door

Constellations funds and builds care homes for people with an intellectual disability, in Belgium.