10th house : Les Anémones


Constellations  in collaboration with the asbl Les Anémones / Fundraising 2022- 2025

 The aim is to build a unit for 10 children with autism spectrum disorders and dual diagnosis. The centre for adults will also be rebuilt, with 11 additional dual diagnosis places added.

Les Anémones is one of Wallonia's oldest and best-known not-for-profit organisations, specialising in care for people with learning disabilities and dual diagnosis. Its residents are divided into a residential centre (day and night) for children and a residential centre for adults. There are also supervised flats.

We will be following with interest the collaboration and complementarities that will be established with another of our homes, the La Maisonnée dual diagnosis adult home.

The construction of the new building housing these new activities will cost €6,000,000. The operating costs will be borne by the Walloon region.

We are supporting this project with €400,000 for the construction. We have received the agreement of the ROGER DE SPOELBERCH Foundation for a very substantial amount and of the Lokumo Foundation, and already had the support of Ceperive, which brings Constellations' total effort to €2,300,000. The non-profit association Les Anémones has also achieved spectacular results, leaving us with only €400,000 to find for the construction, which has just been found thanks to further support from the ROGER DE SPOELBERCH Foundation.

At present, we still need to find €300,000 for the equipment, including the installation of a Snoezelen.

A fund-raising campaign currently under way on social networks is generating promising results, and Constellations will be trying to contribute once again with friendly foundations. 

 

We obtained planning permission in just 3 months!Construction has progressed very quickly, as you can see below.

The site began in mid-May 2023 with the laying of the foundations. The prefabricated blocks were then laid in August. The building was rendered watertight at the end of December 2023. At the beginning of 2024, the exterior joinery and interior partitions were installed, along with all the special technology, i.e. electrical installations, ventilation units, etc. Next came all the insulation work, underfloor heating and screeds, followed by insulation, waterproofing of the roofs and finishing with gyproc panels.

 July and August will be devoted to interior painting, sanitary fittings and lighting.

The building will be delivered in mid-September 2024, a real tour de force for which the whole team is to be congratulated, especially Mr Leriche. As far as running costs are concerned, the AVIQ has just agreed  to open in September 2024.

 

 

3D modelisation of the future building
3D modelisation of the future building

building out of the water



Location and contact

Les Anémones Asbl

Rue du Pétrau 11, 1390 Grez-Doiceau, Belgique

Email: secretariat@lesanemones.be

Phone: 010 / 84 56 15

Website : https://www.lesanemones.be/

Le contenu Google Maps ne s'affiche pas en raison de vos paramètres des cookies actuels. Cliquez sur la politique d'utilisation des cookies (Fonctionnels) pour accepter la politique d'utilisation des cookies de Google Maps et visualiser le contenu. Pour plus d'informations, consultez la politique de confidentialité de Google Maps.